Below are the links to all sections in the Final Environmental Impact Report for the Phillips 66 Santa Maria Refinery Throughput Increase Project.
Cover Page
Table of Contents
Executive Summary
1.0 Introduction
2.0 Project Description
3.0 Cumulative Projects Description
4.0 Environmental Analysis
4.1 Air Quality
4.2 Public Safety and Hazardous Materials
4.3 Noise and Vibration
4.4 Public Services
4.5 Land Use and Policy Consistency Analysis
4.6 Transportation and Circulation
4.7 Water Resources
4.8 Other Issue Areas
5.0 Alternatives
6.0 Comparison of Proposed Project Alternatives
7.0 Other CEQA Mandated Sections
8.0 Summary of Mitigation Measures and Mitigation Monitoring Plan
9.0 List of EIR Preparers
10.0 Agencies and Individuals Consulted During EIR Preparation
Appendices
Appendix A - Air Quality FEIR
Appendix B - NOP, Comments, and Responses
Appendix C - NMMATG Annual Report 2009
Appendix D - List of Abbreviations and Acronyms
Appendix E - References
Appendix F - Traffic
Appendix G - Water Supply Assessment
Appendix H - Response to Comments